From booking to collection
What the dolly does on site, how it fits Powerwall 2 and Powerwall 3, and what happens at each stage of the hire.
Send the job dates
Tell us the site postcode and the dates you need the dolly. We confirm availability and quote hire plus delivery in one figure.
It arrives before the install
The dolly reaches site the day before or the morning of the job, giving you time to check it over before the lift. Or collect from Manchester and pay no delivery at all.
Fit, lift, position
Attach via slide rails and locking plate (Powerwall 3) or adjustable straps (Powerwall 2 / Powerwall+). The drill-driven lead screw raises and lowers the unit with precision using a standard 18–20V drill. Pneumatic tyres and hydraulic disc brakes handle stairs and uneven ground.
We take it back
Once the job is done we arrange collection. No cleaning, no servicing, no storage between jobs on your end.
Built for Powerwall 2 and Powerwall 3
Tesla's installation manuals list the dolly as the preferred lifting method for both generations, while allowing any lift equipment rated to 130 kg as an alternative. It is a speed and safety upgrade, not a compliance requirement.
Powerwall 3
Slide rails and a locking plate attach directly to the unit for a firm, repeatable fit through the lift.
Powerwall 2 / Powerwall+
Adjustable straps take the earlier form factor, rated to the same 130 kg capacity.
Any cordless drill
The lead-screw lift is drill-driven. Bring the drill you already own — no impact driver, no specialist tooling.
What you are hiring
Ready to check availability?
Send us the dates and the postcode.